Index of /research/atlas/SCT_Photos
Parent Directory
Alignment bar clash with cooling/
Bare disc7 insertion to bare cylinder/
CERN Cavern Cside 07/
CERN-Cavern Dec07/
Cantilever stand/
Capillary re routing/
Cooling clash with DCS Cable/
D7 TL damage/
Damage to EC-C support cylinder/
Disc 5C FSI ribbon damage/
Disc 7C Cu LMT/
Disc 7C Service & trial insertion/
Disc 9C Insertion/
Disc5/
Disc8 insertion/
Disc9 Lmt fitting/
Disc9c fibre trial/
Dry Gas purge-1st fitting/
EC integration/
EC-A damage exhaust block/
EC-C Base Frame installation Liverpool/
EC-C Baseframe cooling Liv/
EC-C Capillary re routing/
EC-C Disc 1 insertion/
EC-C Disc Allignment/
EC-C Disc insertions/
EC-C July 06 N2purge/
EC-C SR1 Alignment check/
EC-C Services Feedthrough box/
EC-C cpmpletion 10-10-06/
EC_C cooling installation/
Empty cylinder/
Fibre Fitting 7-05/
Fibre potting/
Fibre re-work/
Frame insertion/
Grabber mods/
Insertion Beam Removal trial/
LMT EC-C/
Nikhef Cylinder Prototype/
OTE dry fit/
PPF0 and PPF1 guidance-alignment/
Sheffield ATLAS People/
Side C HEX installation/
Side C cryotat flange installation/
Side C short endo/
TPPCF1C/
Thermal Plug/
Thermal testbox cern/
Transport frame build/
Transport test - Liverpool/